Jacuzzi BY82000 manual Tower and Door Installation

Page 15

TOWER AND DOOR INSTALLATION

STEP 12

Align the glass with glass jamb and insert. Repeat STEPS 8 through STEP 10 for the other fixed glass panel.

STEP 13

Install glazing gasket on fixed glass walls post and jambs on the outside. Note orientation of gasket. Soapy water may help to insert the glazing gasket.

NOTE: The glazing is to be installed on the outside of enclosure for both wall posts and tower jambs.

Clean any soapy residue off the glass and towers. On the inside of enclosure, apply sealant to entire length of glass and wall post as well as the entire length of the glass and tower jamb.

GLASS

INSIDE OF

ENCLOSURE

APPLY SEALANT

WALL POST

GLAZING GASKET

GLASS

APPLY SEALANT

INSIDE OF ENCLOSURE

GLAZING GASKET

JAMB

13

Jacuzzi Whirlpool Bath© BY82000 03/05

Image 15
Contents Summer Rain Person Shower System ONE Wall Important Safety Information Contents Base Specifications SpecificationsROUGH-IN Reference Front View Side View Component IdentificationPreliminary ROUGH-IN Base InstallationCorrect Shim InstructionsClean UP After Base Installation With AIR Feature only Towers and Doors InstallationDetail a Attach air supply pipe to air tower plumbing Shower Base Slide fixed glass panel all the way into wall post Tower and Door Installation Towers and Door Installation Clean UP After Towers and Door Installation Operation Shower TowersAIR Tower Maintenance Tower Fixtures Repair Parts TOWER, 2 Person Shower Tower Plumbing Repair PartsJacuzzi Whirlpool Bath BY82000 03/05 Jacuzzi Whirlpool Bath National Headquarters Jacuzzi Whirlpool Bath Warranty Registration Card