Jacuzzi BY82000 manual Slide fixed glass panel all the way into wall post

Page 14

TOWERS AND DOORS INSTALLATION

STEP 9

Position the fixed glass wall post so that the glass side panel will be parallel with the outside edge of the base. The fixed glass wall post position may vary slightly due to the anchored location of the water tower.

FINISH WALL

GLASS SIDE

PANEL MOUNTED

PARALLEL TO

EDGE OF BASE

EDGE

OF BASE

STEP 10

Level the post in its proper position and mark where screw holes are to be drilled. Drill 3/16" holes and secure with wall anchors and screws provided. Apply tape (provided) firmly over screw heads.

STEP 11

Slide fixed glass panel all the way into wall post.

WALL POST

TAPE (3)

SCREWS (3)

12

Jacuzzi Whirlpool Bath© BY82000 03/05

Image 14
Contents Summer Rain Person Shower System ONE Wall Important Safety Information Contents Specifications Base SpecificationsROUGH-IN Reference Component Identification Front View Side ViewBase Installation Preliminary ROUGH-INShim Instructions CorrectClean UP After Base Installation Towers and Doors Installation With AIR Feature onlyDetail a Attach air supply pipe to air tower plumbing Shower Base Slide fixed glass panel all the way into wall post Tower and Door Installation Towers and Door Installation Clean UP After Towers and Door Installation Shower Towers OperationAIR Tower Maintenance Tower Fixtures Repair Parts Tower Plumbing Repair Parts TOWER, 2 Person ShowerJacuzzi Whirlpool Bath BY82000 03/05 Jacuzzi Whirlpool Bath National Headquarters Jacuzzi Whirlpool Bath Warranty Registration Card