1.Raise the Engine and Oil Tank Assembly about 9 inches onto a secure platform. Connect the Wheels to the axles using the supplied hardware (parts 53 - 55) as previously stated. (It may be necessary to reset the wheel bearings after the Log Splitter has been towed.)
2.With the Engine and Oil Tank Assembly still raised, attach the Rail Assembly (19) using Hex Bolts (24) and Hex Nuts (32). Pay attention to the directional Arrows on the unit. They will aid in assembling the unit in the proper orientation.
Figure A
3.Use Hex Bolt (43) to install the sup- port assembly - See Figure A.
4.The Push Pin (42) is used for both standing and towing positions.
5.Install the Hitch Coupler (39) onto the Rail Assembly (19), using the Hex Bolts (09, 35), a Washer (36), and Hex Nuts (38, 30).
Figure B
6.Install Bezel (45), with 6 sets of Hex Nuts (30) and Hex Bolts (37) - See Figure B.
Figure C
7.The control valve stand is attached onto the oil reservoir with 4 Hex Bolts
(70)- See Figure C.
SKU 56072 | For technical questions, please call | Page 9 |