Dimension One Spas 01510-1030E Rev A Getting Ready To Start, Overview of the Installation, Model

Page 7

Export Sonic Immersion System Dealer Installation Guide

Getting Ready To Start

The Sonic Immersion System can only be installed on spas with the following serial numbers.

Table 1 Sonic Immersion System Ready Spas

 

 

 

 

 

Model

Serial Number

 

 

Aurora HP

91275 or higher

 

 

Aurora II

91210 and higher (Also 91184)

 

 

Aurora XLT

91295 and higher

 

 

Caliente HP

91301 and higher (Also 91290 and

 

 

 

91299)

 

 

 

 

 

 

Californian

91198 and higher

 

 

Chairman

91245 and higher

 

 

Chairman II

91234 and higher

 

 

Diplomat

91197 and higher

 

 

Nautilus

91458 and higher (Also 91455)

 

 

Triad

91372

 

 

Triad II

91625 an higher (Also 91567)

Overview of the Installation

The installation of the Sonic Immersion System is a simple process that includes removing the spa skirt, drilling a few holes using the templates provided to guide you, and then connecting one or more power cables. This guide is provided to help complete this task in a quick and efficient manner.

Required Tools

You will need the following tools to complete the installation:

3

Image 7
Contents Page Page DEALER INSTALLATION Table of ContentsOWNER’S MANUAL Export Sonic Immersion System Using the CD Player Features of the Sonic ImmersionExport Sonic Immersion System Dealer Installation Guide Dealer InstallationThis section intended for use by authorized dealer personnel only Table 1 Sonic Immersion System Ready Spas Overview of the InstallationGetting Ready To Start Required ToolsTape masking, electrical, duct, or packaging ½ in 12.7 mm width Table 2 Required Tools5/16” 7.94 mm Nut Driver or wrench Six inch 15.24 cm square Parts ListMedium Size Needle Nose Pliers Wire Stripper Utility Knife Stapler and Staples Straight Edge Safety GlassesDescription Table 3 Parts ListNumber 01564-03 assemblyPower supply StereoRemove Equipment Compartment Panel Removing PanelsFigure 2. Equipment Compartment Panel Screws Figure 1. Top Side ControlRemove the Sub Woofer Compartment Panel Location of Installation Sub-Woofer Installation LocatorTable 4 Model List Aurora II and ChairmanThe number of screws to be removed will depend on the model of spa Figure 3. Equipment Compartment Panel ScrewsCaliente HP, Triad II, Aurora HP, and Triad 1. Use the screwdriver to remove the spa panel screws, FigureFigure 4. Removing EnviroTect Sheeting Installing the Sub Woofer CompartmentFigure 5. Cutting Rectangle The plug may not come out in one piece Figure 6. Sub-Woofer PlugThe photograph Figure 5 may not look like your spa, refer to Table 1. Sub-Woofer PlugFigure 7. Removing Plug 1. Electrical Conduit After Trimming Figure 8. Electrical ConduitFigure 9. Conduit After Trimming 1. Electrical Conduit Before TrimmingFigure 10. Drilling Hole for Cables 9. A properly positioned sub woofer compartment is shown in Figure Figure 12. Properly Installed Sub-WooferFigure 11. Edge of Frame 1. Bottom Edge of FrameFigure 13. Attaching to Frame Pre Wiring from Equipment Compartment to Sub Woofer CompartmentFigure 15. Attaching Cables and Harness to Fish Tape Figure 14. Fish Tape in Equipment CompartmentFigure 17. Cables in Sub-Woofer Figure 16. Applying Lubricant to CablesFigure 18. Stripping Wires Figure 20. Connecting Wires to Speaker Output Figure 19. Connecting Wires for Power InputFigure 21. Terminals and Controls Figure 22. Connecting Wires to Channel 1 andPre-Wire Power Supply Installation of Power SupplyFigure 23. Setting Controls Figure 25. Connecting Wires to 120 Volt Supply on Power Supply Figure 24. Connector Wire ConfigurationTerminals on Power Supply Figure 26. Connecting Wires to Stereo and 12 V SupplyFigure 27. Connecting Wire to Amplifier Terminals on Power Supply Figure 28. Voltage Switch on Back of Power Supply Installing Power Supply in Equipment CompartmentFigure 30. Connecting Harness to Power Supply Figure 29. Location of Attachment Holes on Power Supply1. Location of Upper and Lower Screw Holes Figure 31. Inserting Wires in Lower Control Box Wiring the Power SupplyPin Connections Table 5 Pin ConnectorsFigure 32. Removing Nut from Ground Terminal Board DescriptionFigure 33. Determining Location of CD Weather Cover Determining Location of CD Weather CoverCutting Panel Hole for CD Player Door Assembly Figure 35. Measuring Horizontal Distance Figure 34. Measuring Vertical Distance1. Bottom of Panel 2. Panel Lay Face Up 3. Top of Panel Figure 36. Aligning Template Figure 37. Connecting MarksFigure 39. Panel Cutout Figure 38. Hole LocationsFigure 40. Bezel and Door Assembly Installation of CD Player Door and BezelFigure 41. Door Assembly Installed Installation of Panel and CD PlayerFigure 42. Door Assembly Ready for CD Player Connection Figure 43. Typical Satellite Speaker Installation Installing the Satellite Speakers\ 1. Caps in Place Figure 44. Protective Caps in PlaceFigure 45. Speaker Wires Attached Installing the Satellite Speaker WiresFigure 46. Installing Speaker Wires Figure 47. Satellite Speaker Wires in Sub-Woofer Compartment Figure 49. Speaker Wires to Satellite Speakers Figure 48. Connecting Satellite Speaker Wires to AmplifierFigure 50. Completed Speaker Installation Securing the Amplifier Complete the InstallationFigure 51. Securing Amplifier to the Frame Page Page Part No. 01510-1030E Rev A  2002 Dimension One Spas