SECTION V ASSEMBLY
IMPORTANT
Tighten all fasteners to specifications on Torque Chart unless otherwise indicated.
5-1 3-POINT LIFT MODELS (285 & 286)
A.Attach
B.Place flex link and pivot tube between top of A- frame struts. Place support yokes on outside of A- frame struts. Fasten together using 5/8” x 6” cap- screw and locknut.
C.Position tailwheel bracket on rear of cutter deck as shown. (Figure
D.Place flatwasher on wheel spindle. Install wheel on tailwheel weldment securing with roll pin.
E.Bolt adjusting bracket to cutter deck using 5/8 x 2” capscrew and locknut.
F.Place tailwheel frame into desired position and fasten with 1/2 x
G.Install Category I lift pins in front holes in mounting brackets and fasten with
Figure | Tailwheel Bracket |
|
H. Attach clutch shield to gearbox as shown in exploded drawing in Figure
I. Remove pivot bolt from spline end of clutch. Remove inspection cover from clutch shield.
J. Slide clutch onto gearbox input shaft aligning bolt hole with slot in input shaft. Fasten with pivot bolt, lockwasher and nut. Torque to 30 ft./lbs.
K. Loosen eight nuts retaining clutch springs 1/3 turn or until spring can be turned with fingers.
L. With tractor at idle speed, engage tractor
PTO drive
M. Retighten nuts to original position. If adjust- ment is necessary, refer to Section
WARNING
N.Fill gearbox with
Height Adjusting Bracket
Tailwheel
Assembly
Rear Safety
Chains
Clutch Shield
Yoke
Flex Link
Driveline
Cat. I or II Hitch Pin
Front Safety Chains
15