Briggs & Stratton 1695284 manual Chute and Tube Installation, Chute Installation

Page 10

Chute and Tube Installation

H

F

E

G

D

C

A

B

Figure 9. Install Chute

A.Mounting Plate

B.Locknuts, 5/16-18

C.Carriage Bolt, 5/16-18 x 5/8

D.Chute Rod

E.Rubber Strap

F.Discharge Deflector

G.Locknut

H.Mounting Hole

Chute Installation

1.Install mounting plate (A, Figure 9) to mower deck as shown. Secure with 5/16-18 x 5/8 carriage bolts (C) and 5/16-18 locknuts (B).

2.Lift discharge deflector (F).

3.Insert lower chute rod (D) into mounting plate (A).

4.Pull rubber strap (E) below discharge deflector, and secure by placing hole (H) over locknut (G).

D

C

H

B

A

F

G

E

Figure 10. Connecting Tube Assembly to Lower Chute and Cover

A.Upper Tube

B.Cover

C.Ridge, Upper Tube

D.Ridge Cutout

E.Lower Chute

F.Strap, Rubber

G.Pin

H.Tube Assembly

CONNECTING TUBE ASSEMBLY TO CHUTE AND COVER

1.Slide the upper tube (A, Figure 10) into cover (B) aligning ridge (C) with cutout (D) as shown.

2.Slide tube assembly(H) over lower chute (E). Secure tube assembly (H) to lower chute (E) using strap (F) and pin (G).

8

Image 10
Contents OPERATOR’S Manual 50 2-Bin BaggerThis page Intentionally Blank Table of Contents Safety Rules Information Safety DecalsGeneral Operating Instructions Counterweight Installation Initial InstallationInstall Blowout Baffles Hitch Installation Hitch InstallationHitch Installation Left View Back ViewBag Support and Cover Installation Bag Support InstallationBag Installation and Tube Assembly Chute and Tube Installation Chute InstallationThis page Intentionally Blank Normal Installation & Removal InstallationNormal Removal Removal