Briggs & Stratton 1695284 manual Bag Installation and Tube Assembly

Page 9

A

 

C

B

 

D

 

Figure 7. Install Collector Bags

A.Cover

B.Collector Bags

C.Grass Bag Hanger

D.Bag Hanger Post

INSTALL COLLECTOR BAGS

1.Raise the cover (A, Figure 7).

2.Attach collector bags (B) using grass bag hanger (C) to bag hanger post (D).

Bag Installation and Tube Assembly

50” Mowers

A

50” Mowers

C

B

Figure 8. Middle and Upper Tube Assembly

A.Upper Tube

B.Middle Tube

C.Screw, 1/4 x 3/4

CONNECTING UPPER AND MIDDLE TUBE

1.Slide the upper tube (A, Figure 8) over middle tube

(B) and secure together using screw (C).

In upper tube:

-Fourth hole from end is for 50” mowers See Figure 8 for hole locations.

7

Image 9
Contents 50 2-Bin Bagger OPERATOR’S ManualThis page Intentionally Blank Table of Contents Safety Decals Safety Rules InformationGeneral Operating Instructions Initial Installation Counterweight InstallationInstall Blowout Baffles Hitch Installation Hitch InstallationHitch Installation Left View Back ViewBag Support Installation Bag Support and Cover InstallationBag Installation and Tube Assembly Chute Installation Chute and Tube InstallationThis page Intentionally Blank Installation Normal Installation & RemovalRemoval Normal Removal