Briggs & Stratton 1695284 manual Normal Installation & Removal

Page 12

Normal Installation & Removal

A.Hitch Assembly

B.Bag and Cover Support Assembly

C.Shoulder Rest

D.Mount Pin

E.Retainer Spring

F.Hinge Pins

G.Retainer Springs

H.Cover hinge Pivots

I. Cover

 

M

J. Bag

 

N

K. Bag Hanger

 

L. Ridge Cutout

 

 

M. Upper Tube

 

 

N. Ridge

 

 

O. Middle Tube

 

 

P. Rubber Strap, Middle

 

 

Q. Pin

 

P

R. Lower Chute

 

O

S. Lower Chute Rod

 

 

 

T. Mounting Plate

 

Q

U. Rubber Strap, Lower Chute

 

V. Discharge Deflector

 

 

W. Locknut Mount

R

V

X. Support Mount

 

 

 

U

W

S

T

J

I K

L

H

G F B

E G F X

C D

C

A

Figure 11. Normal Installation & Removal

NORMAL INSTALLATION & REMOVAL

Installation

NOTE: See previous pages for more detailed installation and operation instructions if necessary.

1.Attach bag and cover support assembly (B) to hitch support assembly (A) by sliding the support mount (X) over the upright support until the support mount (X) makes full contact with the shoulder bolts (C).

2.Insert mount pin (D) through the support mount (X) and upright support (A) as shown.

3.Secure mount pin (D) with retainer spring (E).

4.Attach cover assembly (I) to bag support bracket (B) using cover hinge pivots (H). Secure cover assembly to bag support bracket using hinge pins (F) and retainer springs (E).

5.Raise the cover (I), attach collector bags (J) using grass bag hanger (K) to bag hanger post (D, Figure 7).

6.Lift discharge deflector (V) up and insert lower chute rod (S) into mounting plate (T).

7.Pull rubber strap (U) below discharge deflector (U) and secure lower chute (R) to mower deck by placing hole in rubber strap (U) (hole closest to lower chute) over locknut mount (W).

8.Slide upper tube (M) into cover (I) aligning ridge (N) with ridge cutout (L).

9.Slide tube assembly (O) over lower chute (R) securing tube assembly (O) to lower chute (R) using rubber strap (P) on tube assembly (O) to pin (Q) on lower chute (R).

10

Image 12
Contents OPERATOR’S Manual 50 2-Bin BaggerThis page Intentionally Blank Table of Contents Safety Rules Information Safety DecalsGeneral Operating Instructions Initial Installation Counterweight InstallationInstall Blowout Baffles Hitch Installation Hitch InstallationHitch Installation Left View Back ViewBag Support and Cover Installation Bag Support InstallationBag Installation and Tube Assembly Chute and Tube Installation Chute InstallationThis page Intentionally Blank Normal Installation & Removal InstallationNormal Removal Removal