17MAINTENANCE
BELT AND CHAIN TENSION ADJUSTMENT
ADJUSTING BELT TENSION-
1.Remove the top guard (item 3) by removing the four screws (item 13), two on each side, that secure it to the frame.
2.Locate the top of the belt idler assembly where the clutch cable (item 55) is secured in place. A properly tensioned belt should stretch the idler spring (loacted next to the idler pulley) between 1/4" - 3/8" when the clutch bail (item 54) is held in the drive position.
3.Using a 1/2" wrench loosen the two nuts that secure the cable (item 55) in place.
4.TO INCREASE belt tension adjust these two nuts so that the cable (item 55) is secured in place with an additional 1/4" of the threaded adjuster at the top of the assembly.
TO DECREASE belt tension adjust these two nuts so that the cable (item 55) is secured in place with 1/4" less of the threaded adjuster at the top of the assembly.
5.Replace the guard (item 3) and reinstall the four screws (item 13) that secure it in place.
6.Run the unit to test your adjustment. Repeat as necessary to achieve proper adjustment. A properly adjusted belt will pull the unit up a 15 degree slope when clutched without any belt slip, and will declutch and stop the unit completely when the clutch is released.
NOTE: Never release the clutch on a slope. The unit is heavy and will free wheel down hill.
NOTE: A worn belt will not allow for proper adjustment and must be replaced.
ADJUSTING CHAIN TENSION-
1.Remove the top guard (item 3) by removing the four screws (item 13), two on each side, that secure it to the frame.
2.Locate the bolt (item 31, 33) and nut (item 80) that hold each idler sprocket to the frame of the unit. One idler sprocket sets tension on the wheel drive chain and one sets tension on the tine drive chain.
3.Loosen the bolt and nut and slide the idler sprocket (item 29) in the desired direction.
INCREASED TENSION: Slide the sprocket to the rear.
DECREASED TENSION: Slide the idler sprocket to the front.
4.Tighten the bolt and nut to secure the sprocket in place.
5.Replace the guard and reinstall the four screws that secure it in place.
NOTE: Over tensioning the chain will cause premature chain and sprocket wear. DO NOT OVER TENSION THE CHAIN. A properly tensioned chain will have slack of
DRIVE BELT REPLACEMENT
1.Wait for engine to cool and disconnect spark plug.
2.Remove the top guard by removing the four screws, two on each side, that secure it to the frame.
3.Slide the belt off of the engine drive pulley, and off of the jackshaft drive pulley.
4.Continue sliding the belt along the jackshaft to the right jackshaft bearing away from the pulley and sprockets.
5.Using a 9/16" wrench, remove the two bolts and nuts that hold the jackshaft bearing in place.
6.Carefully lift the jackshaft up until the belt can be slid out underneath the bearing.
7.Slide the new belt in place over the jackshaft.
8.Replace and tighten the bolts and nuts holding the jackshaft bearing in place. Be sure that the jackshaft is aligned straight across between both bearings.
9.Slide the belt along the jackshaft and over both engine and jackshaft pulleys. Be sure the idler pulley is positioned on the flat side of the belt.
10.Check proper belt tension. See BELT TENSION ADJUSTMENT in this manual.
CHAIN REPLACEMENT
NOTE: This procedure will work to change the wheel drive chain or the tine drive chain.
1.Wait for engine to cool and disconnect spark plug.
2.Remove the top guard by removing the four screws, two on each side, that secure it to the frame.
3.Roll the unit until the master link of the chain that you want to repalce is exposed near the jackshaft sprocket.
4.Release the tension on the chain. See CHAIN TENSION ADJUST- MENT in this manual.
5.Using a screwdriver or similar device remove the spring clip that secures the master link in the chain.
6.With the master link removed unwind the chain from the two sprock- ets that it connects.
7.Carefully string the replacement chain around the same two sprock- ets and reconnect it with the new master link provided with your replacement chain.
8.Re set the tension on the chain.
9.Replace the guard and reinstall the four screws that secure it in place.
ENGINE MUST BE LEVEL WHEN CHECKING OR FILLING OIL
Maintenance Schedule | Follow these hourly |
| ||
maintenance intervals. |
| |||
|
| |||
|
|
|
| |
Maintenance Operation | Every Use | Every | Every | |
(Daily) | 25 hrs | 50 hrs | ||
| ||||
|
|
|
| |
Engine (See Engine Manual) |
|
|
| |
|
|
|
| |
Check engine oil |
|
|
| |
|
|
|
| |
Check gear reduction oil level |
|
|
| |
|
|
|
| |
Grease bearings (See Lubrication) |
|
|
| |
|
|
|
| |
Oil chains (See Lubrication) |
|
|
| |
|
|
|
| |
Inspect for loose, worn, |
|
|
| |
or damaged parts |
|
|
|
Throughly clean all debris from unit and tine reel.
Inspect belt
Lubricate caster rigs
Check tine reel nut torque. Torque to minimum 100 ft.lbs
Part No. 360178 | Page 11 of 12 | Form No. F121203A |