American Standard American Standard bath, 754323-100 Rev A manual Under Deck Mounting Instructions

Page 16

UNDER DECK MOUNTING INSTRUCTIONS

Please note that care must be taken to protect the surface of the tub during all aspects of the installation. Do not drill or cut the bath deck with the tub directly beneath it as damage to the tub may result.

1.Install the tub per the installation instructions provided with the unit.

2.Prepare the bath deck support structure per the local codes. Note - the bath deck must be self supporting.

3.Cut bath deck to your specifications.

4.Place the bath deck in position and trace the opening on the tub with a soft pencil. Do not drill or cut the bath deck with the tub directly beneath it as damage to the tub may result.

5.Remove the bath deck and apply a generous bead of waterproof sealant on the outer edge of the traced line.

6.Replace the bath deck and secure it into place.

7.Apply additional sealant along the tub and bath deck interface as necessary to ensure a watertight seal.

8.Remove excess sealant per the manufacturer's instructions.

Finished bath deck surface material must be self-supporting and secured per local codes

Waterproof

Sealant

Bathtub

Bath deck support material

Tub support structure per installation instructions provided with the tub

DRAIN CONNECTION AND

SYSTEM TEST

(before installing bath into

framed out structure)

With supplied cable drain assembled to bath, connect drain outlet to waste line in accordance with the drain assembly instructions. Tighten all drain joints securely. Check the couplings and make sure they are hand-tight. Clean the air bath and fill with water to a point 2" below the overflow. Recheck the couplings and make certain that they are not leaking. (Although the couplings are factory tightened and inspected, some loosening may have occurred during transit.) Make sure the air bath is connected to the electrical supply and turn the air bath on. Check for leaks around all piping connections while the air bath is running.

OVERFLOW ASSEMBLY

VERTICAL

DRAIN PIPE

AIR BATH DRAIN ILLUSTRATION

DRAIN STOPPER

WITH

ADJUSTABLE

BOLT

METAL STRAINER

BOLT

METAL

STRAINER

 

 

FLAT RUBBER

CLOSE

OPEN

GASKET

 

DRAIN WASTE

FLANGE

PLASTIC DRAIN BASE

WEDGE OVERFLOW

GASKET ESCUTCHEON

OVERFLOW

ASSEMBLY SET SCREW

DRAIN ACTUATOR SHAFT

OVERFLOW

 

RETAINER

OVERFLOW NUT WITH O-RING

 

 

AIR BATH NUT

 

WITH WASHER

 

AND GASKET

90˚ ELBOW

HORIZONTAL

PLASTIC

DRAIN BASE

 

DRAIN PIPE

 

 

754323-100 Rev A

16

Image 16
Contents Installation Guide for Green TEA Table of Contents Important Safety Instructions Leveling Stringer not Cutout in Floor for Drain Whirlpool Control AIR Jets Panels Cutout in Floor For Drain Leveling Stringer not Access AIR Blower Pump MotorWhirlpool Heater Lighting System AT this END of TUB To OverflowIntegral Fitting Deck Floor CutoutOutline Skid ResistantControl PanelsFloor Cutout Whirlpool Jets AIRROUGHING-IN References General Specifications for Combination System Installation and Framing Instructions Electrical Installation Diagram Install Before installing bath into Framed out structure Under Deck Mounting Instructions  BTTIPXOJOQIPUPT#BOE$ $0//&$5*0  EJTUVSCTJMJDPOFCFBE 0WFSGMPXOVU SJOH $0//&$5*0/DPOUJOVFEJSCBUI Gjuujoh   EJTITPBQBTTIPXOJOQIPUP4  PWFSGMPXFTDVUDIFPOJOQMBDFQFSQIPUPT5BOE6  IPMEXBUFSEVSJOHVTF4FFQIPUP9$3&BOE$ 1045*/45--5*0/$-&/6134$&.*$-4406-%/&7&3#&64&%0/$3-*$463$&4 05&#-08&3-0$5*0/015*0/ JOTUBMMBUJPONBLFTUIJTFGGPSUQSBDUJDBMUnited States