Exmark Turf Tracer HP manual Throttle Cable HOOK-UP, PTO Engagement Linkage

Page 20

FIGURE 2 SPEED CONTROL

(THROTTLE CABLE HOOK-UP)

3.10Connect the PTO engagement linkage (See Fig. 3). Loosen jam nut and remove turnbuckle from lower linkage. Screw turnbuckle onto both upper and lower linkages simultaneously. Note that threads on upper linkage are left hand. See 5.2.2 for linkage adjustment.

Note: Handles have the drive lever linkage on the inside of the blade engagement lever tab and the hairpin on the outside.

FIGURE 3

PTO ENGAGEMENT LINKAGE

3.11Install the speed control rod assembly (linkage with the yoke installed on one end) into the end of the speed control lever located underneath the center of the console. Insert the end of the linkage (opposite the yoke) into the end of the speed control lever from the right hand side and fasten with a hairpin from the bolt bag.

3.12Connect the lower end of the speed control linkage to the speed control crank located at the top rear of the fuel tank support. Secure with clevis pin and hairpin from the bolt bag.

3.13Install drive lever linkages. Refer to figure 4. Position speed control lever in neutral. Position drive levers in neutral and engage the neutral lock latches (See Figure 5 (b)). Drive lever linkages are shipped with upper ball joints installed. Thread a 3/8-24 LH jam nut, from the bolt bag, onto the lower end of each drive lever linkage. Identify the lower ball joints installed on hydro control arm weldments. Thread lower end of each drive lever linkage into the lower ball joint until hole in upper ball joint aligns with hole in drive lever.

Install 5/16-18 x 1 3/4 hex cap screws and 5/16-18 nyloc nuts from the bolt bag and tighten.

-15 -

Image 20
Contents For Serial Nos 440,000 & Higher Potential Hazard Exmark Parts Plus Program Operators Manual Table of Contents Safety SpecificationsAssembly Instructions Maintenance & AdjustmentsSafety Your Safety is InvolvedSafety Alert Symbol TrainingCarbon monoxide can kill you Operation Potential Hazard Page Maintenance and Storage Safety Signs Riding AttachmentsPage Page Page Specifications Torque Requirements Assembly InstructionsDimensions Machine is shipped with a filled lead acid battery Upper Handle Mounting Throttle Cable HOOK-UP PTO Engagement LinkageECS Handles Drive Lever Linkage Installation Service Hydraulic OILOperation Instructions Drive LEVER, Neutral Lock Latch OperationOff-Run Switch 15 & 17 HP Kawasaki Manual Start only Pre-Start Operating InstructionsPotential Hazard Rotating blades under the mower deck are dangerous Transporting Maintenance & Adjustments Periodic MaintenancePotential Hazard Blade Bolt Installation Service Interval After First 250 hrs, then yearly thereafter Page Charge Pump Location Grease Lubrication Chart Spray Lubricant ChartPage Adjustments Page Neutral Safety Switch Adjustment Blade Engagement LinkageHydro Drive Linkage Adjustment Hydro Control LINK/SWIVEL Adjustment Drive Lever and Latch in Neutral PositionMotor OIL Disposal Hydro Pump Spring Tension SettingWaste Disposal Trouble Shooting Battery DisposalMower Tracks to Left or Right Mower Cuts UnevenlyProblem Engine TroubleshootingEngine Troubleshooting Table Wiring Diagrams Hydraulic Diagram Limited Warranty Exmark Turf Equipment Fold Along Appropriate Line See EXMARK’S Complete Line of Products for Turf Care ALL Rights Reserved