Operation
tube to provide minimum obstruction to flow. Make sure that the upper and the lower ends are oriented properly as the tubes are assembled. (Parting lines should roughly be lined up.)
Figure 18
1.Drill the holes here
28.Slide the lower end of the tube assembly over the blower outlet and align the notch with the tube latch. Latch the tube to the blower.
29.Install the removable weights. Hook the front toe board weight assembly over the top of the weight mounting plate and secure with two hairpins Figure 19).
Weight Quantities
Deck | 48 inch | 52 inch | 60 inch | 72 inch |
Size |
|
|
|
|
|
|
|
|
|
Toe | 3 | 2 | 2 | 1 |
Board |
|
|
|
|
Weight |
|
|
|
|
Caster | — | — | 2 | 2 |
Weight |
|
|
|
|
Note: The removable weights are heavy. Use care when lifting them. make sure that you can hold them securely before lifting them. Use caution when positioning your hands to that you Do Not set them down on your hands or fingers.
Figure 19
30.For LZUV3B Units Only:
A.Install the removable caster weights on the caster arms (see Figure 20).
B.Insert the clevis pin through the bracket hole and fasten with a hairpin.
C.Tighten knob on weight assembly until the weight is clamped securely to the caster arm.
|
| Figure 20 |
|
|
| For LZUV3B Units Only | |
1. | Clevis pin | 3. | Hairpin |
2. | Knob | 4. | Caster weight |
|
|
|
|
Transporting
Transporting a Unit
Use a
17