Ferris Industries 1000z Series, IS3000z Series manual 48 & 52 Blower Mount & Drive Installation

Page 8

48” & 52” Blower Mount & Drive Installation

2.While holding the mount plate vertical and against the chute mount tabs, place the spacers on the mower deck in the recesses of the mount plate. Make sure they are at the bottom of the recess (see

Figure 7). Mark their location with a paint pen or prick punch.

3.Remove the spacers and blower mount plate.

4.Drill 5/16” holes where the spacer location was marked.

Figure 7. Spacer Location

5.Install the spacers (C, FIgure 8) and mount bar (B) on the mower deck and secure with the 5/16-18 x 1- 1/4” bolts (D) and 5/16-18 nylon lock nuts (A).

A

B

 

C

 

 

D

Figure 8. Install Quick Connect Bar

A.

5/16” Nylon Lock Nut (2)

C.

Spacer (2)

B.

Quick Connect Bar

D.

5/16” x 1-1/4” Bolt (2)

6

Image 8
Contents OPERATOR’S Manual Triple Bag Collection System forFerris Limited Warranty Table of Contents Safety Rules Information General Operating Instructions Remove Guard & Spindle Pulley Remove Discharge ChuteRelease Mower Drive Belt Tension Mower Deck Preparation Install Spindle PulleyInstall Guard 48 & 52 Blower Mount & Drive Installation Idler Arm Installation Blower PreparationInstall Bearing & Eyebolt Install Blower & Belt Guard Install Blower & Belt GuardTRIPLE-BAG Collection System Blower Mount & Drive Group Blower Mount & Drive Installation Install Guard & Blower MountBlower Mount & Drive Installation Install Bearing & Spring Install Blower Brace Install Blower Discharge Chute Reattachment Reattaching the Discharge ChuteHardware Identification & Torque Specifications