Husqvarna EZ5224 / 966038301, EZC4824BF / 966047501, EZ5224BF / 966495901 Maintenance Schedule

Page 34

MAINTENANCE

Maintenance Schedule

The following is a list of maintenance procedures that must be performed on the machine. For those points not described in this manual, visit an authorized service workshop. An annual service carried out by an authorized service workshop is recommended to maintain your machine in the best possible condition and to ensure safe operation.

Read “Maintenance” in the Safety Instructions section.

1)First change after 5-8 hours. When operating with a heavy load or at high ambient temperatures, replace every 50 hours. 2) In dusty conditions, cleaning and replacement are required more often. 3) Performed by authorized service workshop.

= Described in this manual

= Not described in this manual

= Refer to the engine manufacturer's manual

Maintenance

 

 

 

At

 

Maintenance

 

 

 

 

 

least

 

 

 

 

 

 

 

 

 

interval

 

 

 

 

 

once

 

 

 

 

 

 

 

 

 

 

 

Daily

 

 

in hours

 

 

 

each

 

 

 

Before

After

Wkly

year

25

50

100

300

 

 

 

 

 

 

 

 

 

 

 

Check the parking brake

 

 

 

 

 

 

 

Check the engine’s oil level (every refueling)

 

 

 

 

 

 

 

Check the safety system

 

 

 

 

 

 

 

Check for fuel and oil leakages

 

 

 

 

 

 

 

Check/clean the engine’s cooling air intake

 

 

 

 

 

 

 

Check the mower deck

 

 

 

 

 

 

 

Check for loose hardware (screws, nuts)

 

 

 

 

 

 

 

Clean under the mower deck

 

 

 

 

 

 

 

Start the engine and blades, listen for unusual

 

 

 

 

 

 

 

sounds

 

 

 

 

 

 

 

 

Check for damage

 

 

 

 

 

 

 

Thoroughly clean around the engine

 

 

 

 

 

 

 

Clean around belts, belt pulleys

 

 

 

 

 

 

 

Check the tire pressures

 

 

 

 

 

 

 

Check battery

 

 

 

 

 

 

 

Sharpen/Replace mower blades

 

 

 

 

 

 

 

Clean the engine’s cooling air intake 2)

 

 

 

 

 

 

Clean the air cleaner’s pre-filter (foam) 2)

 

 

 

 

 

 

Clean the air cleaner’s filter cartridge

 

 

 

 

 

 

(paper filter) 2)

 

 

 

 

 

 

 

 

Check/adjust the parking brake

 

 

 

 

 

 

Inspect muffler/spark arrester

 

 

 

 

 

 

34

Image 34
Contents Operator Manual Page Contents Page Introduction Good Service Manufacturing NumberSymbols and decals Xxxx xxxxxx xxxxx xxxx Xxxxxx xxxxxxxxx. xx xxxxxxxxSymbols and decals Safety Safety InstructionsNever take passengers Personal Safety Equipment Slope OperationChildren Safe Handling of Gasoline General Maintenance Risk of sparking Transport Controls Control LocationsSteering Control Levers Parking Brake Blade SwitchThrottle Control Choke Control Ignition SwitchFuses Fuel Tank Fuel Shut Off Valve Cutting Height AdjusterAlways raise the deck to the highest position for transport Hour Meter Seat Adjustment LeverTracking Knob Training SteeringBefore Starting Starting the EnginePlace controls in neutral position Turn to the start position Weak Battery Connect one end of the Black cable toRunning Secure selected cutting heightOperating On Hills Set blade engagement and throttle control Mowing Tips Stopping the Engine Manual Transport ZT-2800 Bypass LinkagesMaintenance Maintenance ScheduleInterval Daily Once Hours Battery Replacing batterySafety System Fuel FilterFuel Pump Air Filter Tire PressuresBelts Deck Belt InstallationDeck Belt Removal Pump Belt Replacing pump belt Belt installationBelt removal Cutting Blades Adjusting the Mower Deck Leveling deckAnti-Scalp Rollers Caster Wheels CleaningUse protective glasses when cleaning and washing HardwareLubrication GeneralDeck Spindle Front Wheel MountFront Wheel Bearings Deck Outer SpindleTransaxle Transmission Fluid Change Purging Troubleshooting Problem CauseTroubleshooting Storage ServiceWinter Storage Schematics Accessories Technical DataTorque Specifications EZ4824K EZC4824 BF Engine TransmissionDimension EZ4824 EZC4824 BF FrameEZ5224 EZ5224BF Engine EZ5224 EZ5224BF Frame USA requirements CE requirementsDelivery Service Action Date, mtr reading, stamp, signHour Service After the first 5-8 hoursService Journal At Least Once Each Year Service Journal Service Journal Service Journal Page Page 115 387527R1 06/01/10