Husqvarna ZEKW42170, ZEKW52210 manual Service Journal, Delivery Service

Page 70

SERVICE JOURNAL

Service Journal

Action

Date, mtr reading, stamp, sign

Delivery Service

1. Charge the battery.

2. Adjust the tire pressure of all wheels to 15 PSI (1 bar).

3. Mount the steering controls in the normal position.

4.Connect the contact box to the cable for the seat’s

 

safety switch.

 

5.

Check that the right amount of oil is in the engine.

 

6.

Adjust the position of the steering controls.

 

7.

Fill with fuel and open the fuel shut of valve.

 

8.

Start the engine.

 

9.

Check that there is drive to both wheels.

 

10.

Check the mower deck adjustment.

 

11.

Check:

 

 

The safety switch for the parking brake.

 

 

The safety switch for the mower deck.

 

 

The safety switch in the seat.

 

 

The safety switch in the steering controls.

 

 

Parking brake functionality.

 

 

Driving forward.

 

 

Driving backward.

 

 

Engaging the blades.

 

12.

Check the idle speed

 

13.

Check the engine high idle speed

 

14.

Inform the customer about:

Delivery service has been carried

 

The need and advantages of following the service schedule.

out.

 

 

 

The need and advantages of leaving the machine

No remaining notes.

 

 

 

for service every 300 hours.

Certified:

 

The effects of service and maintaining a service journal on

 

 

the machine’s resale value.

 

 

Application areas for Mulching.

 

15.Fill in the sales papers, etc.

 

English-68

Image 70
Contents Operator’s manual Models Page Contents OPERATOR’S Manual ZE RiderEnglish-2 Introduction IntroductionGood Service Manufacturing NumberSymbols and Decals Symbols and DecalsXxxx xxxxxx Repair work Safety Instructions Safety InstructionsGeneral Operation English-8 Personal Safety Equipment Slope OperationChildren Maintenance General Maintenance Risk of sparking Transport Important InformationCustomer responsibilities Controls ControlsMotion Control Levers Parking BrakeMachine must be stopped before activating the parking brake Tracking Seat adjustment boltsFuel Shut Off Valve Refueling By pass linkage FusesHour Meter Ignition SwitchChoke Control Blade switch Throttle ControlAccessories Cutting height pedalOperation OperationTraining Before Starting Starting the EngineDepress the control for disengaging the mower deck Set the choke control USE Full Throttle When Mowing To start an engine with a weak battery To remove cables, reverse orderRunning Operating on hills Mowing Tips Stopping the Engine Moving by Hand Maintenance MaintenanceMaintenance Schedule Nance Once Each Maintenance Before After 100 Replacing battery BatteryTo clean battery and terminals Always use protective glasses when handling the batteryIgnition System Checking the Safety System Checking and Adjusting the Choke Cable Checking and Adjusting the Throttle CableChecking the Engines Cooling Air Intake Replacing the Air Filter Kawasaki Engine Checking the Fuel Pump’s Air Filter Replacing the Fuel FilterChecking Tire Pressures Checking the V-belts Faulty adjustment can cause an accidentChecking the Parking Brake Deck beltDeck belt installation To replace IZT Integraded Zeroturn Transaxle belt Belt installationIZT belt IZT belt removalChecking the Blades Remove blade bolt by turning counterclockwise Adjusting Cutting Height Adjusting the Mower DeckLeveling To adjust anti-scalp rollers Removal and installation of caster wheel Cleaning and WashingUse protective glasses when cleaning and washing Caster WheelsMower is tracking to the right Tracking adjustmentTo adjust parking brake Mower is tracking to the leftLubrication Schedule LubricationLubrication Change transaxles transmission filtersFront Wheel Mount Lubricating the CablesLubricating in Accordance with the Lubrication Schedule Front Wheel BearingsDeck outer spindle Engine Oil Changing the Engine OilChecking the Oil Level Changing the Engine Oil Filter Transaxle Transmission Fluid ChangeExpansion Tank Purging Procedures Trouble Shooting Guide Trouble Shooting GuideProblem Cause English-60 English-61 Storage ServiceStorage Winter StorageWiring Diagrams Wiring diagramTechnical Data Technical DataZEKW42170/968999295 ZEKW52210/968999296 Productivity Torque Specifications Conformity Certificates Conformity CertificatesUSA requirements Delivery Service Service JournalService Journal Action Date, mtr reading, stamp, signAfter the First 5-8 Hours Hour Service English-71 English-72 English-73 At Least Once Each Year English-75 English-76 English-77