DUA1840-0AAA01
2-6
C
H
A
P
T
E
R
2:
I
N
S
T
A
L
L
A
T
I
O
N
A
N
D
I
N
I
T
I
A
L
S
E
T
U
P
Switch 1005 Installation and Removal
The following steps give a brief guide to installing the Switch 1005 into
the chassis and removing it. For detailed instructions, refer to the
LinkBuilder MSH User Guide
, part number DUA1800-0AAA0x.

Installing the Switch 1005

1
If you have a Management Module installed, en sure that both the MSH
chassis and the Management Module are powered on.
If you do not have a Management Module installed, the Switch 1005
can be installed whether the MSH chassis is powered on or off.
2
Undo the screws from the locking bar of the MSH chassis and lift the
bar away from the chassis.
3
Undo the screws from the blanking plate of the slot of your choi ce.
Keep the blanking plate in a safe place. If you remove the Switch 1005,
you must cover any open slot with a blanking plate to mai ntain the
circulation of cooling air and prevent the entry of dust and debris into
the MSH.
4
Holding the Switch 1005 by the front panel, insert it into the guides
and push in fully.
5
Operate the ejectors to secure the Switch 1005.
6
Replace the locking bar and secure it with the screws you removed
earlier.
Once it is correctly installed in the MSH chassis and the chassis is
powered up, the Switch 1005 will run through its Power On Self Test
(POST) sequence. The LEDs on the front panel will flas h during the
POST; see
“LEDs”
in Chapter 1 for more information.