
Installation Guide
Step 3:
Mount the NJ90 Unit to the Wall or Cubicle Outlet with the screws provided.
3.2 - Set up the power supply :
Selecting the power scheme and installing it:
See Appendix C: Setting up the Power Supply (p.8).
You can verify the NJ90 Network Jack Installation by checking the LED’s.
LED Description
  | •On - The NJ90 is connected to the network and a  | 
  | link has been established.  | 
(Lan)  | •Blinking - Network Activity.  | 
  | •Off - There is no connection to the network.  | 
  | 
  | 
  | •On - The NJ90 is receiving power (local or via the  | 
(Power)  | network).  | 
•Off - The NJ90 is not receiving power.  | 
4