A.O. Smith SBD 30 150 warranty Sequence Of Operation Flow Chart

Models: SBD 30 150

1 28
Download 28 pages 50.42 Kb
Page 25
Image 25
SEQUENCE OF OPERATION FLOW CHART

SEQUENCE OF OPERATION FLOW CHART

Description of this flow chart can be found in the “SEQUENCE OF OPERATION” section found on page 23.

Switch power on

Ignition

 

 

Control Board

 

 

to unit.

opens Gas

 

 

 

Valve.

 

 

Thermostat calls

Ignition Control

 

 

Board shuts off

 

 

for heat.

Silicon Nitride

 

 

 

Ignitor after

 

 

 

3 seconds

 

 

Ignition Control

Ignition Control

 

 

Board performs

Board waits 3 more

 

 

diagnostic check on

seconds to

 

 

components

monitor Flame

 

 

 

Sensor.

 

 

Ignition Control

 

 

 

Board sends power

 

 

 

to Exhaust Inducer

 

 

Ignition Control

 

Did Main

 

 

NO

Board shuts off Gas

 

Burner Light?

 

Valve and allows the

 

 

 

Exhaust Inducer to

 

 

 

purge appliance for

 

 

 

20 seconds.

Exhaust Inducer

 

 

 

engages Prover

 

 

 

Switch

 

 

 

 

YES

 

 

 

Ignition Control

 

 

Ignition Control

Board monitors

 

 

units until T’Stat

 

 

Board provides

is satisfied.

 

 

power to Silicon

 

 

 

Nitride Ignitor

 

 

 

Silicon Nitride

 

 

 

Ignitor

 

 

 

warms up for

 

 

 

20 seconds

 

 

 

 

25

 

 

Page 25
Image 25
A.O. Smith SBD 30 150 warranty Sequence Of Operation Flow Chart