2 – Mounting instructions for flange covers, anodes, T&P and insulation package
IMPORTANT:
Start with mounting two plug anodes in the lower and center anode opening on the side of the tank. In the top anode opening you need to mount the outlet anode with
Mounting of the flange, covers and jacket MUST be done in the indicated sequence.
For further information please refer to the installation manual 0307138RO
| Bag D, fixing bracket for |
|
Item | Designation | Quantity |
1 | Bracket | 3 |
|
|
|
| Bag A, flange cover |
|
Item | Designation | Quantity |
2 | Bolds. | 6 |
3 | Gasket | 1 |
4 | Steel flange cover | 1 |
5 | Nuts | 6 |
!!!In case the unit is supplied with a flexible insulation jacket, now start mounting the insulation (see overleaf). If the insulation is of the rigid type, proceed as follows:
| Bag D: Mounting of clean out collar and cover |
|
Item | Designation | Quantity |
6 | parker screws | 5 |
11