Mounting3-3
Power requirements: 100 to 240 VAC (± 10%) at 50 to 60 Hz (± 3Hz). The swi tch
and splitter power supplies automatically adjust to the input voltage leve l. Make
sure that a properly grounded power outlet is within 2.5 m (8 ft) of the switch and
splitter.
The switch and splitter should be located in a cool dry place, with at least 10 cm
(4 in.) of space on the sides for ventilation.
Place the switch and splitter out of direct sunlight, and away from hea t sources or
areas with a high amount of electromagnetic interference. The temper ature and
humidity should be within the ranges listed in the specifications.
If you intend to mount the switch and splitter in a rack, make sure you have all the
necessary mounting screws, brackets, bolts a nd nuts, and the right tools.
Check if network cables and connectors needed for installation are avai lable.
Be sure the splitter is within reach of the punch-down blocks (or patch panel) for
rear panel connections and within reach of the VDSL switch for front panel
connections.
Installing Optional Modules: Before mounting the switch, be sure you install any
optional modules. If you have purchased an optional slide-in 1000BASE-SX,
1000BASE-T, 1000BASE-LX, 1000BASE-X GBIC, 10/100BASE-TX or
100BASE-FX media expansion module, install it now, following the instructions
provided on page 3-5.
To rack-mount devices:
1. Attach the brackets to the device using the screws provided in the Bracket
Mounting Kit.
Figure 3-2. Attaching the Brackets
VDSLSwitch-VS2512A
Reset
Power
Stacking
Diag
Master
On
Off
UpDown
Stacking
VS2512A
100-240V~50-60Hz1A
Console
234567891
01112
VDSL
1
Activity
Link
Activity
Link/Speed
1234
Ethernet
ExpansionModule