ASM 7.0 FAQ (Frequently Asked Questions)
3.A customer can't configure the ASM 7 build 400T with the email alert in case a power supply fails or the raid status changes to degraded.
ANSWER: In warning tab of the Storage Device, please check "Send
However, the power supply of Altos G320, G520, G530, G5350 does not supply power management and cannot be managed through ASM 7.0.
8 of 8 | Acer Confidential |