© Adam Equipment Company 2012 Page 6 Rev C5, January 2012
• Take the scale out of the box.
• Unwind the load cell cable (number 2 on the diagram).
• Run the cable up through the pillar from the base of the scale.
• Use the 4 screws (number 3 on the diagram) to mount the pillar to the
indicator.
• Connector the plug and socket (number 6 and 7 on the diagram) and
insert the pole into the pole holder.
• Secure the pole to the pole holder by inserting the 2 screws (number 9
on the diagram).
• Secure the height rod into the height rod holder (number 4 and 8 on the
diagram).
8
height rod
holder
4
height rod
2
cable to
indicator
1
indicator
10
platform
5
pole
9
screw
3
screw
7
socket
6
plug