B. ADJUSTMENTS

7 DAYS AFTER INSTALLATION AND EVERY 6 MONTHS THEREAFTER

Inspect bolts, nuts, screws, (bearing setscrews), grounding connections, and nonpermanent gas connections (i.e., unions, shutoff valves, and orifices). Fan (impellor) V-belts, along with the motor and drive belts should be examined and replaced if necessary. Tighten loose V-belts when necessary. Complete operational check of controls and valves. Complete operational check of ALL safety devices (i.e., door switches, lint drawer switch, sail switch, burner, and hi-limit thermostats).

NOTE: Squirrel cage type fan (impellor) on the blower motor must be inspected and cleaned every 6 months.

C. LUBRICATION

The fan shaft bearings and ALL the basket (tumbler) drive shaft and idler shaft bearings must be lubricated every 3 months. Use Shell Alvania #2 grease or its equivalent. Lubrication is necessary or premature bearing failure will be the result.

The motor bearings are permanently lubricated and DO NOT require to be serviced.

43

Page 47
Image 47
ADC AD-170SE installation manual Adjustments, Lubrication