Main Door Assembly Replacement

IMPORTANT: When pulling the front panel off, the door

Open main door.

switch harness in the upper right hand corner must be

unplugged.

Holding the door upward remove the 2 screws from the top

 

 

 

hinge block.

NOTE: The main door assembly can be removed to

Lift the door up to remove.

make the panel removal easier. Refer to “Replace Main

Door Assembly” directions.

Reverse this procedure for reinstalling new main door

 

 

 

assembly.

Reinstall the new front panel by reversing the first step

 

through the fourth step.

To Install New Main Door Glass

Reestablish electrical power to the dryer.

Remove main door assembly from dryer (follow main door

 

 

 

removal procedure).

Pulleys

Lay main door on flat surface with the back of the door

Drive Shaft Pulley Replacement

facing down.

Discontinue electrical power to the dryer.

Remove the 4 #10-32 acorn nuts securing the glass to the

Remove rear belt guard.

door.

Remove glass and clean all old sealant off main door.

Loosen V-belts. Rotate pulley and roll V-belts out of

This area must be clean for correct bonding.

grooves.

Place a bead of silicone around the edge door and lightly

Remove setscrew from the 9-inch (22.86 cm) pulley.

press glass into place.

Remove pulley and key.

Reinstall the 4 #10-32 acorn nuts that were removed.

NOTE: A gear puller may be required to remove pulley.

 

IMPORTANT: Do not press hard or silicone thickness

Reverse this procedure for replacement.

between the glass and door will be reduced, resulting in

poor bonding.

NOTE: Pulley must be aligned for proper operation.

 

The door assembly should now be put in an area where it

 

 

 

will not be disturbed for at least 24 hours. Depending on

 

 

 

the conditions, the curing time of this adhesive is 24 to 48

 

 

 

hours.

 

 

 

After the curing period, install main door on dryer by

 

 

 

reversing the first step.

 

 

 

 

 

 

 

 

 

Drive Motor Pulley Replacement

 

 

 

Discontinue electrical power to the dryer.

 

 

 

Remove rear belt guard.

 

Front Panel Replacement

 

Loosen V-belts. Rotate pulley and roll V-belt out of groove.

 

Remove setscrew from the drive motor pulley.

 

Discontinue electrical power to the dryer.

 

 

 

Remove pulley and key.

 

Remove bottom lint drawer assembly.

 

 

 

 

 

Remove the screws securing the front panel to the dryer.

NOTE: A gear puller may be required to remove pulley.

Disconnect the 2 door switch wires located behind the front

Reverse this procedure for replacement.

 

panel.

 

 

 

 

 

Remove the front panel.

 

NOTE: Pulleys must be aligned for proper operation.

14

American Dryer Corporation

450412 - 4

Page 14
Image 14
ADC ML-96, ML-122 service manual Drive Motor Pulley Replacement, Front Panel Replacement

ML-96, ML-122 specifications

The ADC ML-122 and ML-96 are two advanced communication devices designed for efficient data collection and transmission in various applications. Both models are renowned for their robust performance and user-friendly features, which cater to a diverse range of industries.

The ADC ML-122 is a high-performance data logger that excels in multi-channel monitoring. It supports various input types, making it versatile for applications such as environmental monitoring, industrial process control, and research. One of its standout features is its ability to accommodate both analog and digital signals, allowing users to gather a wealth of data from different sources. The device supports a wide temperature range, ensuring reliability in diverse environmental conditions. Moreover, its built-in memory can store extensive data logs, which are easily downloadable for analysis.

On the other hand, the ADC ML-96 is designed primarily for telecommunication and network monitoring. It features advanced signal processing technologies that allow it to analyze and troubleshoot communication lines efficiently. The device is equipped with real-time monitoring capabilities, enabling users to detect issues as they arise, which is crucial in maintaining network integrity. The ML-96's compact design makes it an ideal choice for installation in tight spaces without sacrificing performance.

Both models are built with cutting-edge technologies that enhance their functionality. They integrate wireless communication protocols, such as Wi-Fi and Bluetooth, enabling seamless connectivity to cloud services for data backup and remote access. This feature empowers users to monitor conditions from anywhere, ensuring that critical information is always at hand.

The user interface for both the ML-122 and ML-96 is designed for ease of use. Equipped with a clear display and intuitive controls, users can navigate through settings and view data with minimal training. The devices also offer customizable alerts that notify users of any anomalies, adding an additional layer of security and responsiveness.

In terms of power management, both models utilize energy-efficient components, allowing for extended battery life. This is particularly advantageous in remote sensing applications where power sources may be limited. Furthermore, the ability to integrate with other systems makes these models adaptable to various operational needs.

In conclusion, the ADC ML-122 and ML-96 stand out in their respective markets due to their innovative features, reliable technologies, and user-friendly designs. With their flexibility and performance, they continue to set the standard for data logging and communication monitoring technologies.