![](/images/new-backgrounds/1185026/18502661x1.webp)
T1 ESF CSU ACE User Manual | Chapter 2. Installation |
|
|
POWER-UP TESTING AND INITIALIZATION
When shipped from the factory, the T1 ESF CSU ACE is set to factory default conditions. When power is applied, the unit automatically executes self test, followed by an initialization sequence that sets up the unit.
Self Test
Upon a
1.Board level tests - RAM tests; EPROM checksum
2.Unit level tests - Front panel LED verification
| © 2004 ADTRAN, Inc | 31 |