Vandal and Weather Resistant 1-Gang Sub Station
- INSTRUCTIONS -
The
INSTALLATION:
1. For flush mounting, install sub station in standard
2. For surface mounting, install sub station in the
3. IMPORTANT! This unit is designed for use in normal weather conditions, and is made to allow for drainage and evaporation of moisture that naturally gets into it. Do not apply caulking or silicone sealant around the unit when installing, and do not use weather stripping around the perimeter of the box when mounting. If sealing the unit is required, the bottom must remain unsealed. Sealing the unit will prevent or inhibit moisture from dissipating from inside the unit, which may cause corrosion or deterioration to the internal components over time. Warranty does not cover damage caused by sealing the unit.
Back View
WIRING DIAGRAMS:
LEM SYSTEM:
LEM Master
2 conductor |
| |
shielded wire | ||
|
|
|
| 1 | ||
Power | E | ||||
Source* |
|
|
| ||
+ |
|
| + | ||
|
| ||||
- |
|
|
| - | |
|
|
|
Red
Blk* Jumper Blue & Black
Blu wires together.
|
|
|
|
|
| WIRE COLOR CODE DEFINITIONS: | ||||
|
|
|
|
|
| Red: + side of speaker & call switch, connect to # of master | ||||
|
|
|
|
|
| Black: Common communication, connect to E of master | ||||
LEF, |
| Blue: - side of call switch |
| |||||||
| LEF, |
|
|
|
| |||||
| Master Station* |
|
|
|
| |||||
|
| 1 |
|
| Red |
| ||||
|
|
|
|
| ||||||
|
| 2 |
|
|
|
| Red |
| ||
|
|
|
|
|
|
| ||||
|
| ~ |
|
| 3 conductor |
|
|
|
| |
10 |
|
| shielded wire |
|
|
| * In a single master LEF system | |||
|
|
|
|
|
|
|
|
| ||
E |
| Blk* |
| Blk* | only, 2 conductors homerun can | |||||
|
|
|
| |||||||
+ |
| + |
|
|
|
|
|
| be used with the BLK and BLU | |
- |
| - |
|
| Blu |
| Blu | wires tied together and "E" and | ||
|
|
|
|
|
|
|
|
|
| jumpered at the master station. |
Page 1