Unpacking
Open the shipping cartons of the Switch and carefully unpacks its contents. The carton should contain the following items:
•One the
•One AC power cord, suitable for your area's electrical power connections
•Four rubber feet for shock cushioning
•Screws and two mounting brackets
•This User Guide
If any item is missing or damaged, contact your local reseller for replacement.
Installation
The site where you install the Switch stack may greatly affect its performance. Use the following guidelines when installing the Switch.
•Install the Switch in a cool and dry place. See Specifications for the acceptable temperature and humidity operating ranges.
•Install the Switch in a site free from strong electromagnetic field generators (such as motors), vibration, dust, and direct exposure to sunlight.
•Leave at least 10 cm of space at the front and rear of the hub for ventilation.
•Install the Switch on a sturdy, level surface that can support its weight, or in an EIA
AirLink+ | 11 |