Installation

Machine with Electric Heating

200-240V 3AC

200-240V 3 phase (3AC) should be connected to the connectors “L1, L2, L3”. Refer to Figure 16.

The green/yellow grounding clamp has to be connected to the grounding wire “PE”.

380-415V 3AC + N

380-415V 3 phase (3AC + N) has to be connected to the connectors “L1, L2, L3”, the blue neutral to the “N” connector. Refer to Figure 16.

The green/yellow grounding clamp has to be connected to the grounding wire “PE”.

Electrical Specifications

 

 

Voltage Designation

 

 

Standard

 

 

Electric Heat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Model

Code

Voltage

Cycle

Phase

Wire

Load Full Amps

Circuit Breaker

AWG/mm

kW

Load Full Amps

Circuit Breaker

AWG/mm

kW

2

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P

380-415

50/60

3

3+N+PE

 

Not available

 

21

30

10/6.0

9

 

 

 

 

 

 

 

 

 

 

 

 

 

18

Q

200-240

50/60

3

3+PE

 

Not available

 

27

30

10/6.0

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

X

200-240

50/60

1/3

2/3+PE

12

15

14/2.5

0.75

 

Not available

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P

380-415

50/60

3

3+N+PE

 

Not available

 

36

40

8/10.0

18

 

 

 

 

 

 

 

 

 

 

 

 

 

30

Q

200-240

50/60

3

3+PE

 

Not available

 

49

60

6/16.0

18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

X

200-240

50/60

1/3

2/3+PE

18

20

12/4.0

1.5

 

Not available

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P

380-415

50/60

3

3+N+PE

18

20

12/4.0

1.5

44

50

8/10.0

18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

33

Q

200-240

50/60

3

3+PE

18

20

12/4.0

1.5

63

70

4/25.0

18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

X

200-240

50/60

1/3

2/3+PE

18

20

12/4.0

1.5

 

Not available

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P

380-415

50/60

3

3+N+PE

18

20

12/4.0

1.5

44

50

8/10.0

18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

40

Q

200-240

50/60

3

3+PE

18

20

12/4.0

1.5

63

70

4/25.0

18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

X

200-240

50/60

1/3

2/3+PE

18

20

12/4.0

1.5

 

Not available

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Table 6

After electrical installation is complete, run the machine through a test cycle and check for a clockwise basket rotation during the extract step. If rotation is not clockwise, disconnect the power from the machine and have a qualified electrician reverse any 2 motor leads at the AC drive terminal block.

9001909

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

25