Installation/Operation Supplement
Installation
Table 1 shows recommended minimum clearances on all sides of the
Recommended Minimum Clearances
Model | 18 | 30 | |
|
|
| |
Minimum rear clearance | 24 in. | 24 in. | |
(600 mm) | (600 mm) | ||
| |||
|
|
| |
Minimum clearance | 6 in. | 6 in. | |
between machine and wall | (150 mm) | (150 mm) | |
|
|
| |
Minimum clearance | 1 in. | 1 in. | |
between machines (side) | (25.4 mm) | (25.4 mm) | |
|
|
| |
Minimum front clearance | 16.5 in. | 16.5 in. | |
(door swing) | (419 mm) | (419 mm) | |
|
|
|
Table 1
Thoroughness of detail must be stressed with all foundation work to ensure a stable unit installation, eliminating possibilities of excessive vibration during extract.
CAUTION
Ensure that the machine is installed on a level floor of sufficient strength and that the recommended clearances for inspection and maintenance are provided. Never allow the inspection and maintenance space to be blocked.
W488
The
The standard installation does not require anchoring unless mandated by state or local codes.
Kinetic energy of the cylinder and dynamic loads on the floor or foundation are shown in Table 2.
Table 2 can be used as a reference when designing floors and foundations.
Floor Load Data
Model | 18 | 30 |
|
|
|
Kinetic energy of the | 1386 N/m | 2592 N/m |
cylinder |
|
|
|
|
|
Dynamic bottom load | 700 N/16 Hz | 1000 N/16 Hz |
|
|
|
Table 2
9002062 (EN) | © Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT | 9 |