Installation/Operation Supplement
Mounting Bolt Installation (If Required)
1
2
3
After the concrete has cured and the anchors are installed, proceed as follows:
1. | Place the |
| foundation. Do not attempt to move it by pushing |
| on the sides. Always insert a pry bar or other |
| device under the bottom of the frame of the |
| |
2. | Place the |
| anchors. |
3. | Put bolts through the machine in the anchors and |
| fasten them. The diameter of the bolt must be |
| minimum |
| the spaces between the machine base and floor |
| with machinery grout. Grout completely under |
6in.
(152 mm)
4
CFS485N
| all frame members. Remove front and rear panels |
| to gain access to all frame members. Force grout |
| under the machine base until all voids are filled. |
4. | Remove the spacers carefully, allowing the |
| machine to settle into the wet grout. |
5. | Position washers and locknuts on machinery |
| anchor bolts and fingertighten to machine base. |
CFS485N
1Base Frame
2Bolt
3Washer
4Anchor Bolt/Plug
Figure 3
6. After the grout is completely dry, tighten the |
locknuts by even increments – one after the |
other – until all are tightened evenly and the |
machine is fastened securely to the floor. |
10 | © Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT | 9002062 (EN) |