AT-FS708LE Installation Guide

Selecting a Site

Be sure to observe the following site requirements:

Make sure you are placing the device in a dust-free and moisture-free environment.

Do not block the ventilation openings on the unit. Allow at least 10 centimeters (4 inches) of space at the front and back of the unit for ventilation.

Make sure that the unit’s power is accessible and cables can be connected easily.

Cabling should be away from sources of electrical noise such as radios, transmitters, broadband amplifiers, power lines, and fluorescent fixtures.

Do not place objects on top of the unit.

Use dedicated power circuits or power conditioners to supply power to the unit.

Refer to Table 2 for the cabling specifications for the twisted pair ports.