AT-FS708LE Installation Guide
6.Power ON the
7.Check that the LNK/ACT LED for each port on the switch is green. If a LED is OFF, refer to “Troubleshooting” on page 31.
The
Installing the Unit on a Wall
For
Note
For
1.If attached, remove the rubber feet, data cables, and power cord from the switch.
2.Select a wall location for the switch.
3.Install two plastic anchors and two
29