Manuals
/
Allied Telesis
/
Computer Equipment
/
Switch
Allied Telesis
AT-GS950/16-10 manual Contents
Models:
AT-GS950/16-10
AT-GS950/16
1
6
44
44
Download
44 pages
19.68 Kb
3
4
5
6
7
8
9
10
<
>
Troubleshooting
Specification
Install
Warranty
Circuit Overloading Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of circuits might have on overcurrent protection and supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern. E21
MDI Pin Signals 10Base-T or 100Base-TX
“Safety Symbols Used in this Document” on page
How to
Reviewing Safety Precautions
Safety
Page 6
Image 6
Contents
6
Page 5
Page 7
Page 6
Image 6
Page 5
Page 7
Contents
Installation Guide
Gigabit Ethernet Smart Switches
AT-GS950/16 AT-GS950/24
Copyright 2007 Allied Telesis, Inc
Electrical Safety and Emissions Standards
Translated Safety Statements
Contents
Contents
Figures
Figures
MDI Pin Signals 10Base-T or 100Base-TX
Tables
Table 1. Safety Symbols
MDI-X Pin Signals 10Base-T or 100Base-TX
Tables
“Where to Find Web-based Guides” on page
Preface
“Safety Symbols Used in this Document” on page
“Contacting Allied Telesis” on page
Meaning
Safety Symbols Used in this Document
Symbol
Description
Where to Find Web-based Guides
Contacting Allied Telesis
Sales or Corporate Information Warranty
Management Software Updates
Online Support Email and Telephone Support Returning Products
Overview
Chapter
Features
Front and Back Panels
Twisted Pair Ports
Ports
Uplink Combo Ports
RS-232 Console Port
Description
LEDs
State
State
State
State
Description
Description
Power Supply
Power Workgroup Topology
Network Topologies
Collapsed Backbone
Chapter 1 Overview
Installation
Chapter
Reviewing Safety Precautions
Circuit Overloading Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of circuits might have on overcurrent protection and supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern. E21
Selecting a Site for the Switch
Speed
Cable Specifications
Maximum
Type of Cable
Unpacking the Switch
Installing the Switch on a Desktop
Installing the Switch in an Equipment Rack
Figure 9. Mounting the AT-GS950/16 Switch in an Equipment Rack
Installing an Optional SFP Transceiver
4. Slide the transceiver into the SFP slot until it clicks into place
Unnecessary removal and insertion of an SFP can lead to premature failure
Cabling the Switch
Powering On the Switch
Troubleshooting
Chapter
Chapter 3 Troubleshooting
Environmental Specifications
Technical Specifications
Physical Specifications
Power Specifications
Safety and Electromagnetic Emissions Certifications
Connectors and Port Pinouts
Signal
Pair
Signal
Signal
Appendix A Technical Specifications