Allied Telesis AT-GS950/16-10 Slide the transceiver into the SFP slot until it clicks into place

Models: AT-GS950/16-10 AT-GS950/16

1 44
Download 44 pages 19.68 Kb
Page 35
Image 35
4. Slide the transceiver into the SFP slot until it clicks into place.

AT-GS950/16 and AT-GS950/24 Gigabit Ethernet Smart Switches Installation Guide

4. Slide the transceiver into the SFP slot until it clicks into place.

738

Figure 12. Inserting the SFP

5.Verify that the handle on the transceiver is in the upright position, as shown in Figure 13. This secures the transceiver and prevents it from being dislodged from the slot.

SFP Transceiver

 

Handle

1300

Figure 13. Positioning the SFP Handle in the Upright Position

6. Repeat steps 2 through 5 to install another SFP transceiver.

Note

SFP transceivers are dust sensitive. When a fiber optic cable is not installed, or when you store the SFP, always keep the plug in the optical bores. When you do remove the plug, keep it for future use.

35

Page 35
Image 35
Allied Telesis AT-GS950/16-10 manual Slide the transceiver into the SFP slot until it clicks into place