Chapter 2: Installation
Unpacking the Switch
To unpack an
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the original shipping material if you need to return the unit to Allied Telesis.
2.Place the switch on a level, secure surface.
3.Ensure the following hardware components are included in your switch package. If any item is missing or damaged, contact your Allied Telesis sales representative for assistance.
Two mounting brackets (for either wall- or
Six mounting bracket screws
Four
One AC power cord
Documentation CD
34