Allied Telesis GS900/8POE manual Installing the Switch on a Table or Desktop

Models: GS900/8POE

1 52
Download 52 pages 6.02 Kb
Page 35
Image 35
Installing the Switch on a Table or Desktop

AT-GS900/8POE Gigabit Ethernet Switch Installation Guide

Installing the Switch on a Table or Desktop

To install the switch on a table or desktop, perform the following procedure:

1.Remove all the items from the packaging and store the packaging material in a safe place. In the event a problem occurs and you need to return the unit, please use as much of the original shipping material as possible.

2.Attach the four self-adhesive rubber feet to the bottom of the switch, as shown in Figure 5.

 

 

X-1000Base

 

 

PRODUCT LASER

 

 

ERROR PD

ON PD

 

1 CLASS

 

 

 

 

 

 

ACT

LINK 10/100

 

 

8

ACT

LINK 1000

 

 

 

 

 

 

 

 

 

 

 

ACTIVITY PORT

 

 

 

SFP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POWER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8R

7

 

6

 

5

 

 

4

3

 

2

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Port SFP Combo 1 with Switch POE Mbps 10/100/1000 Port 8

 

 

 

 

 

 

 

 

 

 

 

 

 

PoE

 

 

 

 

 

GS900/8POE-AT

964

Figure 5. Attaching the Rubber Feet

3.Place the switch on a flat and secure surface, leaving ample space around the switch for ventilation.

Refer to “Cabling and Powering on the Switch” on page 43 to complete the installation.

35

Page 35
Image 35
Allied Telesis GS900/8POE manual Installing the Switch on a Table or Desktop