Amana AOCD2770 owner manual Installation, Packing Material, Oven Location, Cabinet Opening

Models: AOCD2770

1 32
Download 32 pages 53.39 Kb
Page 4
Image 4
Installation

Installation

Packing Material

Remove protective packing material from oven. Tape residue can be cleaned with a soft cloth and alcohol. Lean oven to each side and remove shipping base.

Oven Location

Choose a location based on following factors.

Make sure there is adequate space for proper installation.

Carefully read all instructions before beginning installation.

Make sure cabinet base is level.

Cabinet Opening

Prepare the cabinet for wall oven.

F Packing Material

A

BC

E

D

A—52 3/8 inches

B—25 inches

C—24 inches minimum

D—27 inches minimum

E—12 1/2 inches minimum

F—3 inches minimum

Cabinet Opening

Electrical Supply Location

Electrical supply must be located in the area shown.

A B

A

B

A—5 inches

B—16 inches

Electrical Supply Location

Electrical Connection Requirements

Line voltage must not exceed rated voltage. Line voltage less than rated voltage will result in slow heating. Wiring system must conform to U.L. Standards and National Electrical Code. Installation must conform to all local, municipal and state building codes, and local utility regulations. Oven must be connected only to a supplied circuit as specified on rating plate.

This oven requires 3 wires, 115/230-120/240 volts, 60 Hertz A.C. Unit is equipped with a No. 10 ground wire in conduit. Oven should be fused separately from other appliances on a 40 amp circuit minimum. Verify electric power is off from fuse box to junction box until oven is installed and ready to operate.

4

Page 4
Image 4
Amana AOCD2770 owner manual Installation, Packing Material, Oven Location, Cabinet Opening, Electrical Supply Location