2.The V-belts are disconnected from the basket drive motor for shipping. Reconnect V-belts before starting the dryer.

a.To reconnect V-belts

1)Remove hardware holding back (belt) guard and remove guard from dryer.

2)Lay one (1) belt into motor sheave (pulley) groove and wind belt into corresponding groove of the idler pulley by rotating the idler pulley by hand. Rotate the idler pulley an extra turn or two (2) to insure that the belt is tracking properly in the motor sheave (pulley) and idler pulley grooves without twisting.

3)Repeat procedure to reconnect the remaining belt.

4)Replace back (belt) guard and hardware.

3.If more headroom is needed when moving dryer into position, the top console (module) may be removed.

a.To remove top console (module)

1)Disconnect the ground wire (A) at the rear upper left hand corner of dryer.

2)Remove the eight (8) sets of nuts and washers (B) holding the console (module) to base.

3)Open the control door and control panel, and disconnect the white 15-pin plug connector (C) located in the base of the control box.

4)Disconnect white plug connector located outside backside of the control box (provides power to heat circuit).

5)Lift the console (module) off of the dryer base.

IMPORTANT: The dryer must be transported and handled in an upright position at ALL times.

12

Page 16
Image 16
American Dryer Corp AD-115ES II installation manual