Table of Contents

 

Phase 7 OPL Top Panel Assembly

 

For Top Control Models

2

Phase 7 Coin Top PanelAssembly

 

For Top Control Models

3

Phase 7 Top PanelAssembly

 

For Bottom Control Models

4

Front Bottom PanelAssembly

5

Main DoorAssemblies

6

Middle Front PanelAssembly

7

Lint DrawerAssembly

8

Basket (Tumbler)Assembly

9

Front Basket (Tumbler)/Support PanelAssembly

10

Rear Support PanelAssembly

11

Basket (Tumbler) Roller WheelAssemblies

12

S.A.F.E. System PipingAssembly

13

Temperature SensorAssemblies

14

Motor DriveAssembly

15

Direct Spark Ignition (DSI) BurnerAssembly

16, 17

Electric OvenAssembly

18

Lint Box/Blower MotorAssembly

19

BlowerAssembly

20

Blower MotorAssembly

21

Rear Electrical PanelAssembly

 

For Gas Models Only

22

Rear Electrical PanelAssembly

 

For Electric Models Only

23

Heat DuctAssembly

24

Sail SwitchAssembly

25

Base/Top/Sides/Back GuardAssemblies

26

Pedestal Box Option

27

Additional PartsAvailable

28

Page 3
Image 3
American Dryer Corp SL20, CG20 manual Table of Contents