American Dryer Corp ML-75HS installation manual Grounding

Models: ML-75HS

1 56
Download 56 pages 27.94 Kb
Page 26
Image 26

3. GROUNDING

A ground (earth) connection must be provided and installed in accordance with state and local codes. In the absence of these codes, grounding must conform to applicable requirements of the National Electric Code ANSI/NFPA NO. 70-LATEST EDITION. The ground connection may be to a proven earth ground at the location service panel.

For added personal safety, when possible, it is suggested that a separate ground wire (no. 18 minimum) be connected from the ground connection of the dryer to a grounded cold water pipe. DO NOT ground to a gas pipe or hot water pipe. The grounded cold water pipe must have metal to metal connection all the way to the electrical ground. If there are any non-metallic interruptions, such as, a meter, pump, plastic, rubber, or other insulating connectors, they must be jumped out with no. 4 copper wire and securely clamped to bare metal at both ends.

IMPORTANT: For personal safety and proper operation, the dryer must be grounded.

Provisions are made for ground connection in each dryer at the electrical service connection area.

4. ELECTRICAL CONNECTIONS

NOTE: A wire diagram is located in the front electrical control box for connection data.

a. Gas and Steam Models ONLY

NOTE: A CIRCUIT SERVING EACH DRYER MUST BE PROVIDED.

1) Single Phase (1Ø) Wiring Connections (Hookup)

The electrical connections on ALL Single-phase (1 Ø) gas and steam dryers are made into the rear service box located at the upper left area of the dryer.

22

Page 26
Image 26
American Dryer Corp ML-75HS installation manual Grounding