2)Liquid Propane (L.P.) Gas
Dryers made for use with L.P. gas have the gas valve’s internal pressure regulator blocked open so that the gas pressure must be regulated upstream of the dryer. The pressure measured at each gas valve pressure tap must be a consistent 10.5 inches water column (W.C.) - 26.1 mb. There is no regulator or regulation provided in an L.P. dryer. The water column pressure must be regulated at the source (L.P. tank) or an external regulator must be added to each dryer.
|
|
|
|
|
| Type of Gas |
| L.P. | ||
|
|
|
|
|
|
|
|
|
| Conversion |
| BTU |
|
| Natural |
|
| Liquid Propane | |||
MODEL | kcal/hr |
|
|
| Kit | |||||
Per Hour |
|
|
|
|
|
|
| |||
NUMBER | Rating | Qty. | D.M.S.* |
| Part | Qty. | D.M.S.* | Part | Part Number | |
Rating |
| Number | Number | |||||||
|
|
|
|
|
|
|
| |||
300,000 | 75,600 | 3 | #12 |
| 140863 | 3 | #33 | 140855 | 882626 | |
|
|
|
|
|
|
|
|
|
|
|
Shaded area is stated in metric equivalent
* D.M.S. (Drill Material Size) equivalents are as follows:
Natural Gas | #12 | = .1890” (4.8006 mm) |
Liquid Propane Gas .. | #33 | = .1130” (2.8702 mm) |
3.Piping/Connections
ALL components/materials must conform to National Gas Code Specifications, or in Canada, the Canadian Installation Codes (for General Installation and Plumbing). It is important that gas pressure regulators meet applicable pressure requirements and that gas meters be rated for the total amount of ALL the appliance BTU’s being supplied.
The dryer is provided with a
The size of the main gas supply line (header) will vary depending on the distance this line travels from the gas meter or, in the case of L.P. (liquid propane) gas, the supply tank, other
NOTE: Undersized gas supply piping can create a low or inconsistent pressure which will result in erratic operation of the burner ignition system.
Consistent gas pressure is essential at ALL gas connections. It is recommended that a
NOTE: A water column (W.C.) test pressure of 3.5 inches (8.7 mb) for natural gas and 10.5 inches (26.1 mb) for L.P. (liquid propane) dryers is required at the gas valve pressure tap of each dryer for proper and safe operation.
A 1/8” N.P.T. plugged tap, accessible for a test gauge connection, must be installed in the main gas supply line immediately upstream of each dryer.
IMPORTANT: Pipe joint compounds that resist the action of natural gas and L.P. gas must be used.
25