American Power Conversion 990-2485 Installation, Stack configuration, Rack-mount configuration

Models: 990-2485

1 10
Download 10 pages 46.82 Kb
Page 5
Image 5

Installation

Stack configuration

Always place the UPS above the XLBP in a stack configuration.

Total stack configuration height is recommended NOT to exceed 18U. This is the equivalent of two XLBPs and one UPS.

Four screws must be used to secure each tie bracket to the units, (see diagram).

For detailed instructions on installing batteries, the battery doors, and bezels, refer to the Rack-mount configuration section of this manual.

Rack-mount configuration

Install rack-mounting brackets

Four flat head screws must be used to secure each rack-mount bracket to the unit.

8x

Tie Brackets

4x

Install rail cleats

Two pan head screws must be used to secure each rail cleat to the unit.

2x

Install rails in rack.

For details on rail installation refer to the instructions included in the rail kit package.

Mount units in rack

The UPS and XLBP(s) should be installed at or near the bottom of the rack. Always place the UPS above the XLBP(s). Batteries must be removed from the XLBP(s) prior to installing the unit(s) in a rack. Refer to the instructions on the packaging for details on removing the batteries from the XLBP.

SURT192RMXLBP2/SURT192XLBP2 6U User Manual

5

Page 5
Image 5
American Power Conversion 990-2485 user manual Installation, Stack configuration, Rack-mount configuration