Install units in rack

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Secure the UPS and the XLBP in the

 

 

 

 

rack using the cage nuts and

 

 

 

 

ornamental screws included in the

 

 

 

 

7 holes

 

 

package.

 

 

Four ornamental screws and two cage

 

 

 

 

nuts must be used to secure each unit.

 

 

 

 

A cage nut must be used in the top

 

 

 

 

7 holes

 

 

hole of each rack-mount bracket when

 

 

 

 

 

 

securing the unit in the rack.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The bottom hole of each rack-mount bracket can be secured using an ornamental screw in the threaded hole.

Install and connect battery modules, install bezels

4x

4x

Connect all eight battery modules. Failure to do so may cause equipment damage.

Replace the battery doors.

Tighten the screws to secure the battery doors.

Install a bezel on the UPS and XLBP(s).

6

SURT192RMXLBP2/SURT192XLBP2 6U User Manual

Page 6