
SurgeArrest® PM Series |
|
Contents |
|
INTRODUCTION | 1 |
WARNINGS, CAUTIONS, and NOTES | 1 |
INSTALLATION and MAINTENANCE CONSIDERATIONS | 1 |
Fastener Installation | 1 |
Electrical Bonding and Grounding | 1 |
Wire Routing | 1 |
Electrical Connector Mating | 1 |
2 | |
Soldering | 2 |
INSTALLATION | 2 |
TESTING | 2 |
UNPACKING and PRELIMINARY INSPECTION | 2 |
Storage | 2 |
LOCATION CONSIDERATIONS | 2 |
Environment | 2 |
Audible Noise | 2 |
Mounting and Cabinet Data | 2 |
Service Clearance | 3 |
Equipment Performance | 3 |
Product Orientation | 4 |
System Grounding | 4 |
ELECTRICAL CONNECTIONS | 4 |
Overcurrent Protection | 4 |
Voltage Rating | 4 |
Terminals | 4 |
Parallel Connection | 5 |
Wire Size | 5 |
PMH3XLM SERIES INSTALLATION INSTRUCTIONS | 6 |
Typical Unit Installation, Three Phase WYE, 4 Wire, plus Ground | 6 |
Circuit Breaker and Disconnect Switch | 8 |
OPERATION and FEATURES | 8 |
Status Panel Controls, Indicators, and Alarms | 9 |
Audible Alarm and Control | 9 |
Dry Contacts | 10 |
Environmental Monitoring Unit Option | 10 |
CORRECTIVE MAINTENANCE (Repair) | 11 |
Troubleshooting | 11 |
Display Board Removal and Replacement Instructions | 12 |
PREVENTIVE MAINTENANCE - Inspection and Cleaning | 12 |
REPLACEMENT PARTS | 12 |
LIMITED WARRANTY | 14 |
TECHNICAL SUPPORT | 14 |
i |
|