American Power Conversion SYMF800KH manual Top Cable Entry, Preparing for top cable entry Default

Models: SYMF800KH

1 54
Download 54 pages 22.42 Kb
Page 15
Image 15

Top Cable Entry

Preparing for top cable entry (Default)

Cable entry in Top Cover of Input/Output Section.

Top view

 

 

 

M6 Bolt

 

DC

DC

 

cable

cable

 

entry

entry

 

AC IN cable

AC OUT

 

entry

cable entry

BAT 1 BAT 2

Top view

AC IN

AC OUT

90

L3 IN

95

L3 OUT

91

L2 IN

94

L2 OUT

92

L1 IN

93

L1 OUT

1.75 in /

1.75 in /

44.45 mm

44.45 mm

 

 

2.3 in / 58 mm

IN/OUT power cable (top entry)

L1 IN

L1 OUT

92

93

L2 IN

L2 OUT

91

94

L3 IN

L3 OUT

90

95

N

N

Loosen the 8 bolts in both cable entry covers (4 bolts in each cover). Drill holes for the grommets in areas shown. Install the grommets and re-fit the covers.

Install cable lugs on busbars. Use M12 bolts. Feed cables through the top grommets.

Connect L1, L2 and L3 to busbars where indicated.

Symmetra MW 800 kW 3 × 400/230 V Installation - 990-1510D

9

Page 15
Image 15
American Power Conversion SYMF800KH manual Top Cable Entry, Preparing for top cable entry Default