Electrical Installation: Top Cable Entry
Top view of Input/Output Section
M6 Bolt
|
|
|
|
|
| DC |
| DC |
|
| cable |
| cable |
|
| entry |
| entry |
|
AC IN |
| AC OUT | ||
cable entry |
| cable entry | ||
|
|
|
|
|
1.75 in / | 1.75 in / | |
44.45 mm | ||
44.45 mm | ||
| ||
| 2.3 in / 58 mm |
IN/OUT power cable (top entry)
Battery 1 | Battery 2 | | |
(DC1 | (DC2 |
|
BAT1- | BAT2+ |
L1 | In | L1 Out |
L2 | In | L2 Out |
L3 In | L3 Out |
BAT1+
BAT2—
N | N |
Input/Output Section
Feed the battery cables through the grommets
Connect cables from battery system.
Connect cables from battery system.
BAT1- BAT2+
BAT1+
BAT2-
Symmetra MW 800 kW 3 × 400/230 V Installation - | 11 |