American Standard installation instructions Installation Instructions, 3475.500, Roughing-in

Models: 3475.5

1 12
Download 12 pages 56.21 Kb
Page 1
Image 1
Installation

Installation

Instructions

COLONY/COLONY SOFT

3475.500

 

Bidet Faucet and Transfer Valve

with Speed Connect™ Drain

Congratulations on purchasing your American Standard faucet with the Speed Connect drain, a feature found only on American Standard faucets.

 

Certified to comply with ANSI A112.18.1

Speed Connect Drain*

M 9 6 8 6 7 7 R e v . 1 . 1

Fewer parts, installs in less time

Never needs adjustment

Guaranteed to seal properly the first time, every time.

*Your new American Standard faucet is designed to work only with the Speed Connect drain.

To ensure that your installation proceeds smoothly-please read these instructions carefully before you begin.

Roughing-in

 

 

FINISHED

8 TO 12

 

Required tools

 

Dimensions

TRANSFER VALVE

 

 

 

 

WALL

 

 

 

 

(FOR FLUSHING

 

 

 

 

BIDET OUTLINE

RIM OR SPRAY)

 

 

2-1/4

 

 

 

 

(C)

(H)

Screwdriver

Plumbers' Putty or

IS SYMBOLIC

7/8 DIA.

DIA.

 

 

 

 

 

 

Caulking

DOUCHE ADJ. 1-1/4

 

1-3/16

 

 

 

 

2-1/8

DIA.

 

4-1/4

 

 

SPRAY

TO 2-1/4

DIA.

1-1/4

 

 

Phillips Screwdriver

 

 

 

 

 

 

 

 

1-3/8

 

MAX.

 

 

 

Channel Locks

3-7/8

 

 

 

FOR GROUND JOINT

 

DIA.

 

 

 

CONNECTION OR 1/2 "

 

 

 

 

 

 

 

O.D. SLIP (INLETS)

 

 

 

 

 

FINISHED

 

REAR VIEW WITH

 

 

 

5-1/2

FLOOR

 

WALL REMOVED

Adjustable Wrench

 

 

 

 

1-1/4 O.D. TAILPIECE

 

 

 

Tubing Cutter

 

 

 

 

 

 

 

1

 

 

Turn off hot and cold water

 

BIDET FAUCET INSTALLATION

CAUTION

 

supplies before beginning.

6

 

 

 

 

 

 

Place RUBBER RING (10) into ESCUTCHEON (4).

Install LOCKNUT (1) and RUBBER WASHER (2) onto VALVE BODIES (3, 3a). From under side of mounting surface, install VALVE BODY (3, 3a) through valve mounting holes. Threads of VALVE BODY (3, 3a) should extent at least 5/16 of a inch above mounting surface top. Fig. A. Thread ESCUTCHEON (4) onto VALVE BODIES (3, 3a) until snug against internal stop. If necessary, adjust LOCKNUT (1).

 

7

4

BIDET

 

10

LEDGE

8

 

Tighten LOCKNUTS (1) with WRENCH (5) (supplied) to secure VALVE BODIES (3, 3a).

Remove ESCUTCHEON (6), WASHER (7) and UPPER GASKET (8) from TRANSFER VALVE (9). Insert TRANSFER VALVE (9) into the center forward hole of BIDET.

Fig. A.

5/16''

MIN.

4

10

MOUNTING SURFACE

2

 

 

3

 

3a

2

 

 

 

HOT

 

9

COLD

1

 

 

 

 

 

 

 

Replace UPPER GASKET (8) and WASHER (7) and ESCUTCHEON (6) until it locks against internal stop. Position the side threaded outlet rearward and secure MOUNTING NUT (11).

3, 3a COLONY/COLONY SOFT

1

5

11

2 SPRAY INSTALLATION

Assemble SPRAY BODY (1) to BIDET. Using putty, seal underside

6

of SPRAY BODY FLANGE (2) and secure with NUT (3).

Thread SPRAY HOSE (4) with SEAL WASHER (5) to SPRAY BODY (1). Connect other end of HOSE (4) with SEAL WASHER (6) to side outlet NIPPLE (7) of the TRANSFER VALVE (8).

Thread SPRAY CAP (9) onto SPRAY BODY (1).

8

2

9

 

PUTTY

1

7

3 3475.500Bidet Faucet and Transfer Valve

45

4

1

Page 1
Image 1
American Standard installation instructions Installation Instructions, 3475.500, Speed Connect Drain, Roughing-in