2
A.) THIS BATH MUST BE SUPPORTED ALONG IT'S ENTIRE BOTTOM. We recommend the use of mortar as bedding material (sand is not recommended). Apply enough bedding to support the complete bottom of the bath. After the bedding has been poured, and before it sets, position the bath within the recess until the rim is leveled against the leveling stringers (see "Typical Recess Installation") shown below. The rim of the bath MUST NOT support weight. Allow the bedding material to completely harden before applying weight to the rim or bottom of the bath.
TYPICAL RECESS INSTALLATION
(1529mm) LEVELING
STRINGERS
B.) Check level front to back and side to side, shim as necessary. To secure the tub to wood studs, use drywall screws with flatwashers or roofing nails immediately above the flange of the bath. To secure the tub to steel studs, use 4" drywall screws and flatwashers.
TYPICAL FLANGE MOUNTING DETAIL
SUGGESTED BATH
INSTALLATION METHOD
WOOD | STUD |
|
STUDS | TILE | WASHER |
| ||
WATERPROOF DRYWALL |
| |
| OR CEMENT BOARD |
|
| DRYWALL SCREW |
|
| OR ROOFING NAIL |
|
| SEALANT |
|
| TUB |
|
| 1" x 3" (25 x 76mm) WOOD | |
| STRINGER FULL LENGTH |
STEEL | STEEL |
|
STUDS | STUD |
|
|
| |
WATERPROOF DRYWALL | WASHER | |
| OR CEMENT BOARD |
|
| TILE |
|
| SEALANT | 4" (102mm) |
|
| |
|
| DRYWALL |
|
| SCREW |
| TUB |
|
|
| 1" x 3" (25 x 76mm) WOOD |
|
| STRINGER FULL LENGTH |
SECURE THE BATH TO THE STUDS AS SHOWN FOR
WOOD OR STEEL STUD CONSTRUCTION.
C.) Any finish material such as tile or wallboard must be
3
DRAIN CONNECTION
Using recommended drain opening, connect bath drain to waste line. Tighten all drain joints securely.
3