Northern UTA220/UTA220k manual Chapter Installation, Receipt Inspection, Site Preparation

Models: UTA220/UTA220k

1 187
Download 187 pages 21.16 Kb
Page 21
Image 21
Installation

Installation

Chapter 2

Installation

Installation of the UTA220/UTA220k is simple and straight forward. Prior to installation, refer to Chapter 3 to either verify or change strap options.

RECEIPT INSPECTION

After unpacking the equipment, check the contents against the packing list. Inspect the equipment carefully for damage that may have occurred in shipment. If there is damage or material shortage, contact the shipping agent and Motorola for advice and assistance. Motorola suggests that the shipping container and packing material be retained for future shipment.

SITE PREPARATION

The installation area should be clean and free from extremes of temperature, humidity, appreciable shock, and vibration.

Allow ample space at the rear of the UTA220 for cable clearance and air flow. Install the UTA220 within 6 feet of a 115 or 230 VAC grounded outlet as required for the specific model and no farther than 50 feet from the DTE.

UTA220/UTA220k

2-1

Page 21
Image 21
Northern UTA220/UTA220k manual Chapter Installation, Receipt Inspection, Site Preparation