Chapter 7
EIA-366 Dialer Operation
The UTA220 implements the
CONFIGURATION
The upper two ports of the UTA220 are configured as
•Dialer port 3 is dedicated to data port 1
•Dialer port 4 is dedicated to data port 2
OPERATION
Calls are initiated through the parallel dialer port interface (the upper two ports).
The DTE connects to the dialer port by the
Connector functions are shown in Table
Note: If an
| Table | |
|
|
|
Pin |
| Function |
|
|
|
1 |
| Frame Ground |
|
|
|
2 |
| Digit Present (DPR) |
|
|
|
3 |
| Abandon Call and Retry (ACR) |
|
|
|
4 |
| Call Request (CRQ) |
|
|
|
5 |
| Present Next Digit (PND) |
|
|
|
6 |
| Power Indication (PWI) |
|
|
|
7 |
| Signal Ground |
|
|
|
13 |
| Distant Station Connected (DSC) |
|
|
|
14 |
| Digit Lead 1 (NB1) |
|
|
|
15 |
| Digit Lead 2 (NB2) |
|
|
|
16 |
| Digit Lead 3 (NB4) |
|
|
|
17 |
| Digit Lead 4 (NB8) |
|
|
|
22 |
| Data Line Occupied (DLO) |
|
|
|
UTA220/UTA220k |